Jump to content

ACE Moharram Bakhoum

From Wikipedia, the free encyclopedia
(Redirected from Draft:ACE Moharram Bakhoum)
ACE Moharram Bakhoum
Company typePrivately held company
IndustryEngineering
Founded1950; 74 years ago (1950)
FounderAhmed Moharram and Michel Bakhoum
Headquarters
Number of locations
Branches in 10 countries
Area served
Worldwide (37 countries)
ServicesEngineering and Project Management
Number of employees
2,300
Websitehttp://www.ace-mb.com/

ACE Moharram Bakhoum is a multi-disciplinary engineering and project management consultancy company, based in Egypt.[1]

Operations

[edit]

The company operates in 37 countries, working on both private and publicly financed projects.[1]

History

[edit]

ACE Moharram Bakhoum was established in 1950 as a private partnership between Ahmed Moharram and Michel Bakhoum.[2] The first projects executed by the partners was a storage area for printing machines constructed in the basement of a building in Cairo, followed by the design of a pharmacological factory. In the 1950s, the partners made their entry into the field of bridge design, for which they later became widely known.[3] By the 1970s, the company witnessed a regional expansion. In 1970, the first phase of the 6th of October Bridge was opened.[4] This bridge, which is considered the main artery of the Egyptian capital, was the first prestressed concrete bridge to be entirely designed, constructed and the construction supervised by Egyptian firms.[5] ACE Moharram Bakhoum was the designer and construction supervisor.[6] By this time, ACE had been involved in numerous high-profile projects in Egypt and the Middle East region, and the expansion of its activities to include other disciplines was necessary.[6][3] Currently, ACE Moharram Bakhoum is one of the largest engineering offices in Egypt.[7] In 2020, ACE Moharram Bakhoum won the International Project of the Year Award by MEED for the Rod El Farag Cable Stayed Bridge, over the River Nile.[8]

Completed Projects

[edit]

Examples of significant projects designed, managed, or supervised by ACE Moharram Bakhoum:

References

[edit]
  1. ^ a b c "ACE sees more opportunities in development". Daily News Egypt. 2009-12-21. Retrieved 5 February 2021.
  2. ^ "StackPath". dailynewsegypt.com. Retrieved 2021-02-05.
  3. ^ a b "ACE Moharram.Bakhoum – Engineering global solutions". Retrieved 2020-07-05.
  4. ^ "كوبري 6 أكتوبر الشهير في العاصمة المصرية يرتدي حلة جديدة". الشرق الأوسط (in Arabic). Retrieved 2020-07-05.
  5. ^ "صور.. "كوبرى أكتوبر.. حدوتة مصرية".. السائقون: الكوبرى سبب ارتفاع نسبة الطلاق بمصر.. ولو رجع الزمن ماكناش اشتغلنا الشغلانة دى.. بائع الجرائد: "الإنترنت قتل مهنتنا" وبعت زمان لمحمود المليجى ودلوقتى محدش بيشترى". اليوم السابع. 2018-01-12. Retrieved 2020-07-05.
  6. ^ a b "ميشيل باخوم.. "مهندس" جلسات الغرام في منطقة الدقي". صوت الأمة. 2017-12-15. Retrieved 2020-07-05.
  7. ^ "StackPath". dailynewsegypt.com. Retrieved 2021-02-05.
  8. ^ "2020 National Winners and Finalists – MEED Project Awards". Retrieved 2021-02-05.
  9. ^ "6th of October Bridge". structurae.net. Retrieved 5 February 2021.
  10. ^ Ibrahim, Samia. "محفوظ" الأمين المساعد للشئون البرلمانية لحزب " مستقبل وطن " و "المكتب الاستشاري الفرنسي" شركة ( سيسترا- محرم – باخوم) يعاينان مدخط مترو الانفاق إلي قليوب/الخبر". الخبر (in Arabic). Retrieved 2020-03-02.
  11. ^ "محور روض الفرج "كوبرى تحيا مصر" | المقاولون العرب". arabcont.com. Retrieved 2020-03-02.
  12. ^ "Rod El-Farag Axis Bridge in Egypt receives Guinness World Record title". Middle East Architect. Retrieved 2020-03-02.
  13. ^ "ACE sees more opportunities in development - Daily News Egypt". Archived from the original on 2020-03-02. Retrieved 2020-03-02.

Founder & Managing Director ACE Moharram Bakhoum Group