Shuangbai Road station
Appearance
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Shuangbai Road and South Lianhua Road, Minhang District, Shanghai China | ||||||||||
Coordinates | 31°05′05″N 121°25′03″E / 31.084588°N 121.417453°E | ||||||||||
Line(s) | Line 15 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 23 January 2021 | ||||||||||
Services | |||||||||||
|
Shuangbai Road (simplified Chinese: 双柏路; traditional Chinese: 雙柏路; pinyin: Shuāngbǎi Lù) is a metro station on the Line 15 of the Shanghai Metro. Located at the intersection of Shuangbai Road and South Lianhua Road in Minhang District, Shanghai, the station was scheduled to open with the rest of Line 15 in 2020.[1][2] However, the station eventually opened on 23 January 2021 following a one-month postponement.[3] Since Dec. 30, 2021, this station has become the terminal station of short-route trains, in place of West Huajing station.[4]
References
[edit]- ^ Labour Daily (2019-01-28). "2019年上海轨交建设规划公布 多条新线建设". Bendibao.com (in Chinese). Retrieved 2019-02-08.
- ^ Shanghai Shentong Metro Group Co., Ltd. (2018-09-03). "上海申通地铁集团有限公司2019届高校毕业生招聘简章". Shanghai Metro (in Chinese). Retrieved 2019-02-09.
- ^ 1月23日起上海地铁15号线开通初期运营 [Shanghai Metro Line 15 to open on 23 January]. www.shmetro.com (in Chinese). 21 January 2021. Retrieved 21 January 2021.
- ^ "15号线工作日早晚高峰增投列车 运力最高提升36%". Xinmin Wanbao (in Chinese). 2021-12-29. Retrieved 2022-01-08.